Practice 7/21/25

Time: 6:00pm – 9:00pm Attendance: Eric, Gavin, Nick, Jordan, Preston, Kyle, Dave, Stephen. Continue making progress on the t-shirt cannon robot transition into the cosmetic attributes. Starting to think about FTC we programmed the new robot.

What we did today.

  • Jordan: worked on covering up wiring by mounting panes onto the t-shirt cannon robot
  • Kyle: scavenged the compound searching for materials for the t-shirt cannon robot
  • Eric: Designed another wire management box for the t-shirt cannon robot
  • Nick: Created 3d models of the panels that got placed on the t-shirt cannon robot
  • Gavin: Programmed the arm for the practice FTC. including the vertical lift horizontal extension and opening and closing the hand.
  • Preston: Micro Managed everyone after installing the 3rd barrel mount.
CAD for electrical box on T-Cannon

What we need to do:

  • Get more T-Nuts for the extruded aluminum on the t-shirt cannon robot.
  • mount the panels onto the t-shirt cannon robot. This includes figuring out how each panel will fit together.
  • paint the t-shirt cannon robot.
  • run braided cable cover on solenoid wires.
  • transfer and update the onshape file for the t-shirt cannon robot.
Scrounged materials for the t-shirt cannon skin

CATEGORIES:

Practice

Tags:

No responses yet

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest Comments