Blog

Practice – January 4th

Robot was tested. Everything works, but not well. Michael finalized the coding for the robot, mainly running into issues with servos. Eric, Gavin, and Jordan[…]

Practice – January 2

Michael coded the brush and vertical basket. Eric, Jordan, and Nick fixed and lubricated the vertical system. Preston continued with documentation.

Practice – December 28

Jordan worked on the basket to lift specimens. Eric worked on stabilizing the horizontal arm. Gavin added mechanical stops to the horizontal arm and worked[…]

Practice – December 26

Nick and Eric worked on attaching the Horizontal Arm to the robot. Preston worked on a bracket to stabilize a component of the vertical arm,[…]

Practice – December 23rd

Gavin worked on troubleshooting issues with the vertical arm. Eric worked on fixing the horizontal arm and getting it ready for installation. Nick and Jordan[…]

12/14/2024 Practice

Carter put the sign on the robot. Gavin finished putting together the vertical arm, while Nick and Eric reconstructed the new hand and did some[…]

Dec 7, 2024 – Practice

  Gavin, Preston, Michael and Jordan attached the vertical arm to the base drive. Carter began working on mini-bot to learn system. There will NOT[…]

Practice – December 2nd

We got the robot moving!!!!! Gavin worked on the vertical arm. Nick worked on making the horizontal grabber more compact. Eric worked on developing a[…]

Practice – December 30

Nick and Eric worked on attaching the collection basket to the vertical arm. Jordan and Carter worked on attaching the license plates to the robot.[…]

11/25/2024 Practice

Gavin continued to assemble smaller vertical arm. Michael fixed servos and code for brush and horizontal lift. Eric, Nick, Carter and Kyle organized the room[…]

Practice – November 23

Preston worked on making the vertical arm thinner. Jordan mounted the control hub and batteries to the robot. Gavin tapped screw holes in the vertical[…]

November 18

• Gavin worked on the assembly of the vertical arm. • Nick worked on the horizontal grabber hand. • Michael and Eric worked on mounting[…]

Practice – November 16

Preston made some CAD modifications to a planned specimen grabber. Jordan and Gavin disassembled the vertical arm and prepared the robot for a new arm[…]

Practice – November 11

Gavin worked on better integrating the arm into the robot. Nick and Eric worked on the horizontal arm/grabber. Carter looked into a bracket for a[…]

Practice – November 4th

Preston finished the revised furniture budget Michael, Jordan, and Carter dissassembled the old base. Eric and Nick finished the horizontal arm. Gavin attached the vertical[…]

11/2/2024 – Practice

Nick and Carter moved the motors to the new robot chassis.

Practice – October 28 Halloween Practice!

Preston Worked on the Aerobotics Furniture Budget Michael got roadrunner installed and ready to start and worked on a servo-powered claw. Worked on Vertical Claw.[…]

Practice – October 26

Preston worked on reducing the total cost of the Aerobotics Furniture Budget. Michael worked on implementing roadrunner as well as tested a lift arm. Nick[…]

Practice – October 21

Preston worked on improving the model for the first grabber prototype. Michael and Jordan worked on fixing the gearboxes on the robot base. Gavin worked[…]

Practice – October 14th 120e6754f89180088400fbd98916510b

Eric Worked on modeling the Vertical Arm Nick and Jordan worked on building a new robot base. Kyle and Carter worked on sorting components and[…]